New Community and Condos Construction in St Petersburg, Florida

Become a Featured New Construction Project in St Petersburg

Featured new construction advertising placement available in St Petersburg, Florida
YOUR PROJECT Could Be Featured Here

Feature Your Project

Be the first builder or developer featured on the St Petersburg page. Promote your newest construction project and reach thousands of local buyers.

  • Premium Homepage Placement
  • Reach Local Buyers
  • Generate Qualified Leads
  • Increase Project Visibility

No Featured New Construction Projects Yet

This premium space is available for builders to promote their latest development.

New Construction in St Petersburg

New Construction Projects in St. Petersburg, Florida

Project 1: Residences at 400 Central

  • Developer: Red Apple Real Estate (John Catsimatidis)
  • Location: 400 Central Ave, downtown St. Petersburg, FL
  • Type: Mixed-use (luxury condominiums, Class A office, retail)
  • Units/Size: 301 luxury condominiums; ~45,000 sq ft office; ~60,000 sq ft retail; 1.3 million sq ft total
  • Status: Recently completed / phased occupancy (TCO issued for lower floors)
  • Expected Completion: 2025–2026
  • Description: Tallest residential tower on Florida’s Gulf Coast (46 stories, 515 ft). Features presold condos with Gulf and downtown views, retail, and office space. One-third of units reportedly presold.[1][2]

Project 2: Art House St. Petersburg

  • Developer: Kolter Urban
  • Location: 275 1st Avenue South (or 235 1st Ave S area), downtown St. Petersburg, FL
  • Type: Luxury condominiums
  • Units/Size: 244 luxury condo units
  • Status: Recently completed
  • Expected Completion: 2025
  • Description: 42-story tower that topped out in late 2024. Includes two- and three-bedroom units plus penthouses; strong pre-sales reported.[3][4]

Project 3: 3rd & 3rd

  • Developer: Echelon (St. Pete-based) in partnership with Third Lake Capital
  • Location: 235 3rd Street South, downtown St. Petersburg, FL
  • Type: Luxury apartments / mixed-use
  • Units/Size: 262 apartment units (studios to penthouses); ~15,000 sq ft ground-floor retail; 330-space garage
  • Status: Under construction (topped out April 2026)
  • Expected Completion: Late 2026
  • Description: 33-story (375 ft) tower with extensive amenities including an 8th-floor pool deck, fitness center, coworking spaces, and large private terraces. Adjacent to University Village.[5][6]

Project 4: Sky Town

  • Developer: Altis Cardinal
  • Location: 3201 34th Street South, Skyway Marina District, St. Petersburg, FL
  • Type: Mixed-use apartments / residential
  • Units/Size: 2,084 apartments across six phases; 69,000 sq ft retail (anchored by Sprouts); self-storage
  • Status: Under construction (vertical construction on first phase underway)
  • Expected Completion: Phased (ongoing through multiple years)
  • Description: Large-scale $800 million redevelopment of former Ceridian campus on 34+ acres. Includes significant mixed-income housing and neighborhood retail.[7][8]

Project 5: Halcyon at The Central (The Central project)

  • Developer: Ellison Development
  • Location: 1301 Central Avenue, EDGE District, St. Petersburg, FL
  • Type: Mixed-use (Class A office, hotel, retail, affordable housing)
  • Units/Size: 11-story office tower (~130-140k sq ft); 168-key Marriott Autograph Collection hotel; 42-unit affordable/workforce housing component; retail and parking
  • Status: Under construction
  • Expected Completion: Halcyon/office early 2027; other elements 2026–2027
  • Description: Major redevelopment including the first trophy-class office tower in downtown in decades, plus hotel, retail, and workforce housing. Part of broader Central Avenue District revitalization.[9]

Project 6: Fairfield Avenue Apartments

  • Developer: HP Capital
  • Location: 3300 Fairfield Avenue South, near Warehouse Arts District, St. Petersburg, FL
  • Type: Affordable / workforce apartments
  • Units/Size: 264 units (mix of 1-, 2-, and 3-bedroom)
  • Status: Under construction (groundbreaking early 2026)
  • Expected Completion: 2028
  • Description: $94 million project with income-restricted units (various AMI levels). Includes multiple buildings and community amenities; one of the larger recent affordable developments.[10]

Project 7: Amara Bay Residences & Marina

  • Developer: Key International (with townhome sites sold to Mattamy Homes)
  • Location: 12000 Gandy Boulevard, north St. Petersburg, FL
  • Type: Mixed-use waterfront (luxury apartments, townhomes, marina, restaurant)
  • Units/Size: 415 luxury apartments + townhomes; 150-slip marina; 8,000 sq ft restaurant
  • Status: Under construction (vertical underway; some buildings topped out)
  • Expected Completion: Initial buildings Q4 2026; phased thereafter
  • Description: 39-acre waterfront redevelopment on Tampa Bay with resort-style amenities, boardwalk, and public marina access.[11]

Additional notable upcoming/planned projects (limited public details or earlier stages) include Roche Bobois Residences (29-story, 165 condos, start 2026, completion ~2028), Deuces Rising townhomes (24 affordable/workforce units, announced), Pelican Place (40 affordable townhomes, sitework 2026), and SeaWinds (Mattamy Homes multi-phase single-family/townhomes, groundbreaking spring 2026). The large Historic Gas Plant District redevelopment remains in planning/proposal stages.[4]

Limited public information is available for some smaller or very early-stage projects. All listed projects are based on verifiable announcements and reports from 2024–2026.

Need a correction?