New Community and Condos Construction in Ocoee, Florida

New Construction in Ocoee

New Construction Projects in Ocoee, Florida

Project 1: The Regency at Ocoee

  • Developer: Selnik Development
  • Location: 1601 Maguire Road, Ocoee, FL (between Florida’s Turnpike and State Road 50, near Old Winter Garden Road and Maguire Drive)
  • Type: Luxury Apartments (Residential, multi-family)
  • Units/Size: 300 units (20 studio, 109 one-bedroom, 147 two-bedroom, 24 three-bedroom) across seven four-story buildings on ~17 acres
  • Status: Under Construction / Nearing Completion
  • Expected Completion: 2026 (grand opening July 7, 2026)
  • Description: Luxury garden-style apartment community with modern finishes, amenities, and elevators/air-conditioned corridors; first units delivered starting May 2026.[1]

Project 2: Elan Crown Point (Crown Point Village)

  • Developer: Greystar (joint venture with Wire Development)
  • Location: 2285 Crown Village Road, Ocoee, FL
  • Type: Mixed-use Apartments (Residential with ground-floor commercial elements)
  • Units/Size: 315 units (one-, two-, and three-bedroom apartments and townhomes, including live-work options)
  • Status: Under Construction
  • Expected Completion: 2026 (first units Fall 2025; final touches and leasing underway as of early 2026)
  • Description: Mixed-use rental community with resort-style amenities, direct West Orange Trail access, and planned commercial space as part of a broader village development.[2]

Project 3: Wynwood

  • Developer/Builder: D.R. Horton
  • Location: Ocoee, FL (addresses include Spineywood Drive area)
  • Type: Single-family Homes (Residential)
  • Units/Size: Multiple single-family homes (3–5 bedrooms, various floor plans from ~1,500–2,800+ sq ft); active community sales
  • Status: Under Construction / New Construction
  • Expected Completion: Ongoing (homes available for sale/purchase as of mid-2026)
  • Description: New single-family residential community with amenities such as a resort-style pool and cabana; concrete-block construction and smart-home features.[3]

Project 4: Reserve at Lake Meadows

  • Developer/Builder: Ryan Homes
  • Location: Ocoee, FL (scenic Lake Meadow setting with access to SR 429, SR 408, and Turnpike)
  • Type: Single-family Homes (Residential)
  • Units/Size: Multiple homes (3–4 bedrooms, floor plans ~1,500–2,800 sq ft); select lakeview opportunities
  • Status: Under Construction / New Construction
  • Expected Completion: Ongoing (community opened/recent phases active as of 2025–2026)
  • Description: New single-family community in a scenic lakeside setting with easy highway access.[4]

Project 5: City Center West Orange (CCWO)

  • Developer: Limited public details available on specific entity (project-specific development)
  • Location: Ocoee, FL (150-acre site in West Orange County’s tourist corridor, near major highways including SR 408, SR 429, and Turnpike)
  • Type: Mixed-use (Residential apartments/condos + retail, entertainment, hotel, office)
  • Units/Size: ~500 luxury apartments/condominiums + 200,000–500,000+ sq ft commercial/retail/office/hotel space
  • Status: Pre-construction / Construction to resume in 2026 (phased)
  • Expected Completion: Phased delivery starting 2026+
  • Description: Large-scale lifestyle/mixed-use center with main-street, waterfront charm, Mediterranean design, trails, and walkable urban amenities.[5]

Project 6: Ocoee Village Center (Residential Phases)

  • Developer: Konover South
  • Location: Clarcona Ocoee Road and N. Lakewood Avenue area, Ocoee, FL
  • Type: Mixed-use (Residential townhomes/apartments + commercial/grocery)
  • Units/Size: Planned 232 townhomes and 320 luxury apartments (in addition to commercial phases)
  • Status: Commercial phase recently completed/open; Residential phases announced/pre-construction (break ground planned 2026)
  • Expected Completion: 2026+ for residential
  • Description: Multi-phase development with retail (including planned Walmart Neighborhood Market and gas station), followed by residential components.[6]

Note: Additional active single-family/townhome communities (e.g., Magnolia Reserve by Hartizen Homes, phases of Arden Park by Lennar) are underway with ongoing new home construction and sales. Larger projects like The Dynasty | Ocoee (Montierre Development) remain announced but stalled amid legal disputes with no groundbreaking as of mid-2026. Industrial projects like 429 Business Center were recently completed (2025). Information is based on publicly available reports as of September 2026; verify directly with developers or the City of Ocoee for latest details.

Become a Featured New Construction Project in Ocoee

Featured new construction advertising placement available in Ocoee, Florida
YOUR PROJECT Could Be Featured Here

Feature Your Project

Be the first builder or developer featured on the Ocoee page. Promote your newest construction project and reach thousands of local buyers.

  • Premium Homepage Placement
  • Reach Local Buyers
  • Generate Qualified Leads
  • Increase Project Visibility

No Featured New Construction Projects Yet

This premium space is available for builders to promote their latest development.

Need a correction?