New Construction in Fort Pierce
New Construction Projects in Fort Pierce, Florida
Project 1: King’s Landing
- Developer: Live Oak Development (lead; previously Audubon Development); Villas portion associated with INB Homes
- Location: Waterfront site of former H.D. King Power Plant, along Indian River Drive / downtown Fort Pierce
- Type: Mixed-use (hotel, condominiums/residences, retail, restaurants, parking garage)
- Units/Size: 148-room Marriott Tribute Portfolio hotel, approximately 100 condominiums/residences, 10 luxury villas/townhomes, retail/restaurant space, parking garage (516 spaces in revised plan)
- Status: Under construction (villas progressing with foundations and near-completion on some units; overall site plan approved with phases)
- Expected Completion: Phase 1 (hotel-anchored) by July 2028; Phase 2 by May 2029; final phase by November 2029
- Description: Major waterfront mixed-use redevelopment transforming the former power plant site into a hotel, residential, dining, and retail destination connecting downtown to the Edgartown area. Some funding challenges noted for the hotel portion as of mid-2026.[1][2]
Project 2: Vela Cove
- Developer: Pulte Homes (with Cornerstone Fort Pierce Development LLC)
- Location: Approximately 50 acres at/near 2721 South Jenkins Road (off Okeechobee Road)
- Type: Residential (single-family homes)
- Units/Size: 239 single-family homes (floorplans 1,300–1,900 sq ft, 3–5 bedrooms)
- Status: Announced/approved; land acquired; infrastructure and grading underway or imminent
- Expected Completion: Buildout targeted for early 2027 onward (model homes/sales starting 2027)
- Description: New master-planned neighborhood with resort-style amenities (pool, parks, tot lot) aimed at value-oriented buyers, including those relocating from higher-cost South Florida markets.[3]
Project 3: Causeway Cove
- Developer: Ashton DePeyster / G Flash GP Inc. (leveraging Florida Live Local Act)
- Location: 601 Seaway Drive, South Hutchinson Island
- Type: Mixed-use waterfront (residential, hotel, commercial/retail, marina)
- Units/Size: 913 residential units (at least 40% affordable for 30 years), 407 hotel rooms, commercial/retail space, 218 marina slips; five buildings (up to ~17 stories / 192 ft)
- Status: Administratively approved; advancing through permitting and conditions (31 conditions noted); construction targeted to potentially begin by end of 2026
- Expected Completion: Limited public information available on final timeline
- Description: Large-scale waterfront development proposed as one of the city’s largest, including high-rises, hotel, marina, and retail with required affordable housing component.[4]
Project 4: Boardwalk on the Inlet
- Developer: Sandy Woods (local car dealer/family ownership) with planner Dennis Murphy
- Location: South Hutchinson Island waterfront (between Square Grouper Tiki Bar and Manatee Island Bar and Grill)
- Type: Mixed-use (hotel, residences/condos, retail, restaurants/private club)
- Units/Size: 175 hotel rooms, 54 residences/condos, 23,000 sq ft retail, 16,000 sq ft restaurant/club space, ~700 parking spaces; two buildings (one up to 160 ft)
- Status: Proposed; moving through city planning process (Technical Review Committee review in June 2026)
- Expected Completion: Limited public information available
- Description: Waterfront hotel and commercial complex seeking height variance; early-stage planning for inlet views and mixed amenities.[5]
Project 5: Sunrise Village Apartments
- Developer: Blue Sky Communities
- Location: North side of Okeechobee Road, west of 31st Street (infill site)
- Type: Residential (affordable apartments)
- Units/Size: 106 units (1-, 2-, and 3-bedroom) across three three-story buildings with clubhouse and amenities
- Status: Under construction (site cleared as of early 2026)
- Expected Completion: Spring 2027
- Description: Affordable housing infill project as part of city initiatives to increase quality housing options in the urban core.[6]
Additional notes: Several smaller or commercial projects (e.g., Buc-ee’s travel center with estimated 2028 opening, a large Amazon refrigerated warehouse with 2027–2028 CO targets, Pointe Grand apartments under construction, and hospital parking garage expansion) exist but have more limited or primarily commercial/public details. New single-family homes appear in various subdivisions (e.g., Celebration Pointe, Tidewater), but no other large-scale master-planned residential or mixed-use projects with substantial public details were identified beyond those listed. Information is current as of available 2026 sources.
Become a Featured New Construction Project in Fort Pierce
Feature Your Project
Be the first builder or developer featured on the Fort Pierce page. Promote your newest construction project and reach thousands of local buyers.
- Premium Homepage Placement
- Reach Local Buyers
- Generate Qualified Leads
- Increase Project Visibility
No Featured New Construction Projects Yet
This premium space is available for builders to promote their latest development.