New Construction in Estero
New Construction Projects in Estero, Florida
Project 1: Woodfield Estero (Coconut Village / Mixed-Use at Lyden Drive)
- Developer: FRP Development Corp in partnership with Woodfield Development
- Location: 23281 Lyden Drive (northwest corner of US 41 and Coconut Road), Estero
- Type: Mixed-use (apartments, retail, office, hotel)
- Units/Size: Phase 1: 296 apartments + ~30,000 sq ft retail (three- and four-story buildings); full buildout: ~600 apartments, 80,000 sq ft retail, 20,000 sq ft office, 190-room boutique hotel
- Status: Under Construction (vertical construction underway as of August 2026)
- Expected Completion: Phase 1 deliveries beginning Q3 2027
- Description: Major mixed-use town center development on a 45.6-acre site across from Coconut Point, featuring residential buildings with resort-style amenities, retail/dining, office space, and a hotel at full buildout.[1]
Project 2: Lumio Estero
- Developer: Atlantic Residential and Riverside Investment & Development
- Location: 21650 Via Coconut Point, Estero
- Type: Luxury multifamily apartments (mixed-use elements with retail/office/restaurant opportunities)
- Units/Size: 330 units (studios to 3BR) across three four-story buildings; additional commercial space planned
- Status: Under Construction (broke ground December 2025)
- Expected Completion: Leasing late 2026; move-ins early 2027
- Description: Resort-style luxury apartment community with amenities including two pools, fitness center, coworking space, golf simulator, resident market, 1.5-acre lake, and walking paths, plus build-to-suit commercial opportunities.[2]
Project 3: Downtown Estero / FL Star Project
- Developer: FL Star (formerly associated with Buckingham Co.)
- Location: East of US 41, north of Broadway Avenue, Estero
- Type: Mixed-use residential
- Units/Size: 310 residential units (three mid-rise buildings of ~100 units each + 10 townhomes); limited commercial in later phases
- Status: Under Construction (infrastructure and site work underway)
- Expected Completion: First buildings targeted around 2027 (full project 2028–2029)
- Description: Village-style residential community with mixed-use buildings, amenities including a pocket park, pool, pickleball courts, and walking trails. Previously referred to as Downtown Estero.[3]
Project 4: Summercrest (Estero Town Homes)
- Developer: Toll Brothers
- Location: Northeast corner of Corkscrew Road and Sandy Lane, Estero
- Type: Townhomes
- Units/Size: Up to 154 two-story townhomes on 21.4 acres
- Status: Pre-construction (construction expected to start late 2026)
- Expected Completion: First half of 2027
- Description: New townhome community offering 3BR + loft floor plans ranging from approximately 1,944–2,495 sq ft.[4]
Project 5: Kingston (Multiple Phases)
- Developer: Master developer Cameratta Companies; builders include Pulte Homes, Neal Communities, Taylor Morrison (Esplanade at Kingston)
- Location: Corkscrew Road corridor, Estero area
- Type: Residential (single-family homes and condominiums)
- Units/Size: Multiple phases including ~550 single-family homes (Neal), ~320 single-family homes (Pulte), and 126 condominium units (Taylor Morrison Esplanade); part of a larger master-planned community
- Status: Under Construction / Pre-construction (groundbreaking November 2025; site work underway)
- Expected Completion: Ongoing; first closings targeted fall 2026 onward
- Description: Large-scale master-planned residential community with single-family homes and resort-style condos; includes plans for a K-8 school site and significant conservation land.[5]
Project 6: Verdana Village
- Developer: Cameratta Companies (built by Lennar and Pulte)
- Location: East Corkscrew Road, Estero
- Type: Residential master-planned community
- Units/Size: Approximately 2,400 homes at full buildout (mix of single-family, villas, condos)
- Status: Under Construction (East Village began 2025; West Village nearly sold out)
- Expected Completion: Ongoing multi-year buildout
- Description: Active master-planned community with new construction homes from multiple builders, Publix-anchored retail at the entrance, and extensive amenities.[4]
Project 7: The Island at West Bay Club
- Developer: Kolter Urban
- Location: 5100 Bayridge Blvd, Estero (within West Bay Club)
- Type: Luxury condominium
- Units/Size: 86–88 units in a 24-story tower
- Status: Under Construction
- Expected Completion: Late 2026
- Description: High-rise luxury condo tower with waterfront/golf views as part of the established West Bay Club community.[4]
Note: Additional smaller or near-completion projects (e.g., River Creek by GL Homes, nearly built out with ~544 homesites) exist, but the above represent the most significant verifiable current/upcoming developments based on available sources as of September 2026. Some master-planned communities span Village of Estero and adjacent unincorporated areas. Limited public information is available on certain proposed projects still in early review stages.
Become a Featured New Construction Project in Estero
Feature Your Project
Be the first builder or developer featured on the Estero page. Promote your newest construction project and reach thousands of local buyers.
- Premium Homepage Placement
- Reach Local Buyers
- Generate Qualified Leads
- Increase Project Visibility
No Featured New Construction Projects Yet
This premium space is available for builders to promote their latest development.