New Community and Condos Construction in Coleman, Florida

New Construction in Coleman

New Construction Projects in Coleman, Florida

Project 1: Coleman Ridge Master Planned Development (Coleman Ridge MPD)

  • Developer: Coleman CPD, LLC and The Villages Land Operating Company, LLC (affiliated with The Villages)
  • Location: South of the City of Coleman in Sumter County (along/near U.S. 301; specific parcels include areas east of US 301)
  • Type: Mixed-use (residential, industrial, commercial/office)
  • Units/Size: Up to 550 residential units (including workforce housing); 7,000,000 sq ft industrial; 100,000 sq ft commercial/office; total ~684+ acres (including recent additions)
  • Status: Announced/Approved (development agreement and rezoning amendments in 2024–2025; entitlements in place)
  • Expected Completion: Phased (no specific overall completion date publicly detailed; ongoing planning/amendments)
  • Description: Master-planned mixed-use development on mostly vacant land south of Coleman, incorporating residential workforce housing near industrial and commercial uses. Includes the Representative Marlene O'Toole Industrial Park. Recent amendments added ~121 acres for mixed-use integration.[1]

Project 2: U.S. 301 (S.R. 35) Widening and Realignment Projects (FPIDs 430132-4, 430132-2, 430132-5)

  • Developer: Florida Department of Transportation (FDOT)
  • Location: U.S. 301 corridor through and around Coleman, Sumter County (from C.R. 470 to Florida’s Turnpike area; includes new bypass alignment east of the city)
  • Type: Infrastructure (new road construction and widening)
  • Units/Size: Approximately 2+ miles new alignment (plus widening segments totaling several miles); multi-phase with shared-use paths
  • Status: Under Construction / Pre-construction phases (right-of-way acquisition ongoing; initial phases started or imminent)
  • Expected Completion: Phased through 2030 (e.g., new alignment ~late 2027 for construction, full opening later; other segments 2027–2030)
  • Description: Major widening of U.S. 301 to four lanes with median, plus a new roadway realignment/bypass around the east side of Coleman to improve traffic flow, safety, and accommodate trucks/industrial growth while enhancing the downtown pedestrian environment. Total project costs in the hundreds of millions.[2]

Project 3: Coleman Water Treatment Facility Upgrades

  • Developer: City of Coleman
  • Location: Coleman Water Treatment Facility (city facility)
  • Type: Municipal infrastructure (water treatment upgrades)
  • Units/Size: Replacement/ rehab of pumps, motors, controls, chlorine contact tank, well pump, and iron filters
  • Status: Planning / Pre-construction (funding requested; shovel-ready status pending)
  • Expected Completion: March 2027 (construction start targeted October 2026)
  • Description: Upgrades to maintain safe drinking water supply and meet FDEP standards for city residents. Limited additional public details available on exact scope beyond the listed improvements.[3]

Limited public information available on additional private residential, condo, or townhome developments directly within Coleman city limits. Coleman is a small community, and most activity centers on infrastructure and the larger nearby master-planned mixed-use project. Coleman Flex Business Park (flex/industrial space) was completed in 2021 and falls outside the recent 3-year window. No other verifiable major new construction projects matching the criteria were identified in current sources.

Become a Featured New Construction Project in Coleman

Featured new construction advertising placement available in Coleman, Florida
YOUR PROJECT Could Be Featured Here

Feature Your Project

Be the first builder or developer featured on the Coleman page. Promote your newest construction project and reach thousands of local buyers.

  • Premium Homepage Placement
  • Reach Local Buyers
  • Generate Qualified Leads
  • Increase Project Visibility

No Featured New Construction Projects Yet

This premium space is available for builders to promote their latest development.

Need a correction?